Mixed Waste Management Facility. Monthly Report, February 1994
Author | : |
Publisher | : |
Total Pages | : |
Release | : 2005 |
ISBN-10 | : OCLC:68557201 |
ISBN-13 | : |
Rating | : 4/5 (01 Downloads) |
Book excerpt: During February, significant progress was made toward the completion of the Conceptual Design (CD), particularly in developing a methodology and process for estimating CD costs and providing roll-up information in preparing the CD. As a result of this effort, a number of changes to the WBS were instituted to ensure that all key elements of the roll-up can be identified. Using the revised WBS, a bottom-up cost estimation for the CD was initiated, and an integrated schedule was developed. System Design Requirements and process flowsheets were frozen and placed under formal change control. An integrated project schedule was completed, including key project linkages between process engineering, permitting, B494 upgrade, and operations planning activities. Work also began to update the detailed PERT/critical-path schedule to reflect current CD plans. As a result of a number of DOE informal reviews during January and February, additional Project guidance was received for the preparation of several project documents and supporting information on the historical funding and manpower expenditures relative to identified milestones and markers. Documentation requested included the Technology Selection Plan for Primary Processes (Milestone 115-5) and reports and briefings addressing the implementation of Molten Salt oxidation (MSO). A draft joint LLNL/ORNL Plan for the Demonstration and Deployment of the MSO Process was developed along with documentation for the resolution of MSO issues identified in the December 1993 MSO Technical Review.